• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

Big Roll Sod & Turf Tubes

Big Roll Sod & Turf Tubes - Pickup or Delivery | COMANCO

Big Roll Sod & Turf Tubes

Big Roll Sod & Turf Tubes are used by commercial sod installers, sod harvesters, and commercial turf rollers to transport sod or turf from the growing field to the installation site. The tubes protect the sod or turf from damage during transport, and they also make it easier to handle and install the sod or turf. There are many benefits to using Big Roll Sod & Turf Tubes, including:

  • Protection: The tubes protect the sod or turf from damage during transport, which can help to improve its quality and appearance.
  • Ease of Handling: The tubes make it easier to handle and install sod or turf, which can save time and labor costs.
  • Efficiency: The tubes can help to improve efficiency by reducing the amount of time and labor required to transport and install sod or turf.
  • Environmentally Friendly: Cardboard tubes are an environmentally friendly alternative to plastic tubes.

Our Materials:

HDPE – Durable, High-Density Polyethylene

Our Dimensions:

6” Diameter

1/2” Thickness

Our Lengths:

48” – 42” – 36” – 30”

Big Roll Sod & Turf Tubes - Pickup or Delivery | COMANCO
Name(Required)
Email(Required)
Please provide details for your inquiry.

Read more about Big Roll Sod Tubes from our Blog:

COMANCO Employees Reviewing Front End Loader Inspection Diagram at Ring Power
COMANCO Mobilizes for Emergency HDPE Pond Liner Repair in Northern Nevada
COMANCO SWA Landfill Expansion Overlay Liner Installation
COMANCO Advances Landfill Liner Installation Following Challenging Site Conditions
COMANCO Advances Landfill Closure with Multi-Layer Geosynthetic Installation and Quality-Control Excellence
COMANCO Insights | Pregnant Solution Ponds
COMANCO Full Landfill Expansion Cell Overview
COMANCO Leadership Retreat Flag Photo
COMANCO Landfill Rain Cap Geomembrane Liner Tire Ballast
COMANCO Defensive Driver Training
COMANCO Brings Precision to HDPE Liner Installation in Idaho
COMANCO Geomembrane Liner Deployment Excavation Testing Pond
Rebecca Thomas Promoted to Fleet Coordination Supervisor
Wastewater Pond Liner Installation
COMANCO Team Members Posing At The 10th Annual Bayside And Solar Charity Clay Shoot At Tampa Bay Sporting Clays In Land O Lakes Florida
Sabrina Brehm Fleet Inventory Supervisor Promotion
COMANCO Protects Mining Containment Through Routine Geomembrane Inspection and Repair
SWA Golf Tournament Park Ridge COMANCO Team
COMANCO Crew FPPC BBQ Dinner Lakeland 2026
COMANCO Booth at the FLSME 2026 Conference
geosynthetic-heap-leach-liner-system-comanco
Agru Green Geomembrane Gypsum Stack Closure
Colorado Gold Mine Pond Liner Replacement Highlights COMANCO's Mining Containment Expertise
AGRU America Fernley 2 Pipe Plant Lake Tahoe Comanco
COMANCO Tackles Complex Phosphate Gypsum Pond Closure in Central Florida
COMANCO ETP Liner Technician Group Photo
COMANCO leaders Breslin strategies retreat canyon
COMANCO Team Caterpillar Construction Technology Days Peoria
North Florida Landfill Closure
Jimmy Hernandez Martinez Promoted to Liner Technician
The COMANCO Way: Quarter 3 2026 Newsletter Is Here
Morning Tailgate Safety Meeting at Sunrise
COMANCO at FMI Project Manager Academy
Pastor Rodriguez Hernandez Promoted to Liner Technician
COMANCO Insights | Choosing the Right Geomembrane for Mining Applications
Martin Ramirez Chino Earns Promotion to Liner Technician
A Visit to Ring Power CAT Riverview: Equipment, Expertise, and Customer Service
Hector Tiburcio Duran Earns Promotion to Liner Technician
Cruz Hernandez Earns Promotion to Heavy Equipment Operator
A New Approach to Man-Made Lagoon Beach Construction
COMANCO Brings Employee Wellness to the Field
COMANCO Employees Put Heavy Equipment Skills to the Test at Ring Power
COMANCO Completes Liner Repairs for Repeat Customer in Oklahoma
Jose Reyes Becerra Earns Promotion to Heavy Equipment Operator
COMANCO Recognizes New River Crew Following Safe Completion of EGC Phase
COMANCO Insights | HLP Construction
COMANCO Completes Detailed Pond Liner Installation in Bonita Springs, Florida
Aerial view of the North Florida landfill closure showing the completed white geomembrane cap
COMANCO Awarded Landfill Closure Project By Palm Beach SWA
COMANCO Attends 2026 SWANA Summer Conference in Orlando
COMANCO Advances Gypstack Expansion
Ring Power instructor and COMANCO operators standing beside a new CAT D1 SSLGP low ground pressure dozer during on-site training
Data Center Infrastructure & Environmental Construction | COMANCO
COMANCO Continues to Invest in Employee Growth Through Technology Training
Carlos Melendez Rodriguez Earns Promotion
COMANCO Completes Landfill Containment Project in Puerto Rico
COMANCO Employees Attend Skid Steer Operator Training
COMANCO Drivers Earn Hazmat & CDL Tanker Endorsements
PVC Retention Pond Liner Installed at Oak Ridge Development
Jose Pena Villegas Earns Promotion
COMANCO Replaces Golf Course Pond Liner at Mountain Lake Golf Course
COMANCO Attends FMI Field Leader Institute
COMANCO Celebrates 37 Years of Excellence
COMANCO 2026 Q2 Newletter
COMANCO Attends the Silver State Stampede in Elko, Nevada
COMANCO Advances Innovative Closure System at New River Landfill
COMANCO Completes Landfill Liner Installation in Puerto Rico
COMANCO Begins Phase One of Innovative Landfill Closure
COMANCO Installs First-of-Its-Kind Water Feature
COMANCO Employees Attend FMI Emerging Managers Institute
COMANCO Attends International Phosphate Fertilizer & Sulfuric Acid Technology 2026 Conference
Kevin Jimenez Earns Promotion
COMANCO Attends the 2026 Elko Mining Expo
COMANCO Finalizes Large-Scale Liner Installation at Louisiana Phosphate Facility
Aerial overview of the SWA Palm Beach landfill showing the active mound, the expansion work area, and staged equipment
Image: Ivan Guerra Simon, newly promoted QA/QC Technician at COMANCO
COMANCO Performs Preventive Gypsum Stack Pond Liner Inspections and Repairs
COMANCO Continues Multi-Phase Closure and Containment Operations
COMANCO Installs Another Methane Gas Management System Supporting Land Repurposing Efforts
Roberto Fernandez Earns Promotion to Leadman
Cross-section infographic of a double-lined HDPE lithium process pond and its containment layers
COMANCO Performs Specialized Piezometer Abandonment to Restore Containment Integrity
COMANCO Attends WOCA 2026 Conference in Lexington, Kentucky
COMANCO Advances on Multi-Pond Closure Work at Central Florida Phosphate Facility
COMANCO Executes Pond Liner Repairs for North Florida Correctional Facility
COMANCO Performs Annual Maintenance on Rapid Infiltration Basins to Support Groundwater Recharge
COMANCO Completes Landfill Cell Construction for Longstanding Florida Client
COMANCO Completes Quarterly Inspections and Repairs for Nevada Mining Operation
COMANCO Continues Large-Scale Liner Installation at Louisiana Phosphate Facility
Bertin Rubio Lagos Earns Promotion to Liner Technician
COMANCO Attends 2026 FPPC Spring Conference
COMANCO Restores Containment Integrity Through Rapid Liner Repairs
COMANCO Installs High-Temperature HDPE Liner System for Industrial Cooling Pond
Martin Alarcon Earns Promotion to Leadman
COMANCO Continues Closure Work at New River Landfill with Phase II EGC System
COMANCO Completes Large-Scale Fuel Containment System at Oklahoma Power Plant
COMANCO Supports Containment for Industrial Wood Treating Operations with HDPE Liner System
COMANCO Connects with Future Workforce at Hardee High School Career Fair
COMANCO Maintains Quality in Lagoon Liner Installation Near Houston, Texas
Hunter Gossett Earns Promotion to Assistant Project Manager
Secret Link