Progress on Landfill in Arcadia

COMANCO Makes Progress on the Liner and Earthwork for a Landfill in Arcadia, Florida. COMANCO’s Superintendents Jeremy Giles and Gerardo Ruiz are making progress on the Liner and Earthwork for a Landfill cell in Arcadia, Florida. The team is currently …

Read more
by
  • Artboard-1-400x300.png
  • Artboard-2-400x300.png
  • Artboard-3-400x300.png
  • Artboard-4-400x300.png
  • Artboard-5-400x300.png

COMANCO Gets The Liner Rolling

COMANCO Gets the Liner Rolling at Newly Redesigned Sanitary Collection Cell After completing the Redesign Stage at a new sanitary collection cell in Central Florida, COMANCO is finally ready to get the liner rolling. Though the redesign initially stalled the …

Read more
by
  • 01-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 02-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 04-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 03-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 05-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 06-HOF-Proj-Update-Jan-2023-Blog-400x300.png

Headway Made on 5-Layer System

Headway Made On 5-Layer Geosynthetic System as COMANCO Prepares to Install Geomembrane Flap. COMANCO makes headway installing a 5-layer geosynthetic system in Central Florida. Once complete, the new Class I Landfill will be a safe repository for Class I Waste. …

Read more
by
  • 01-RIverview-BLog-400x300.png
  • 02-Riverview-Blog-400x300.png
  • 03-Riverview-Blog-400x300.png

COMANCO prepares for Dewatering

COMANCO Prepares for Dewatering Ditches After Installing Liner on the Slopes of Central Florida Work Site.  COMANCO prepares for dewatering ditches on a vast Central Florida project. At the end of 2022, the crew installed the last bit of liner …

Read more
by
  • COMANCO-Central-Florida-Chemical-Plant-blog-2-400x235.jpg
  • COMANCO-Central-Florida-Chemical-Plant-blog-3-400x235.jpg
  • COMANCO-Central-Florida-Chemical-Plant-400x235.jpg

COMANCO Overcomes Setbacks at Chemical Plant

Upon completing the remaining 3 Acres of subgrade earthwork needed for 60 mil liner install to complete our project, we experienced a tremendous record-breaking 4 inches of rain. This was definitely a setback, but our on-site Superintendents Scott Hall, Jorge …