Evergreen LF – Concrete Truck Pad
Installation of reinforcing bars for a concrete truck pad at Veolia ES’s Evergreen Landfill in Valdosta GA.
Installation of reinforcing bars for a concrete truck pad at Veolia ES’s Evergreen Landfill in Valdosta GA.
The Citrus County Central Landfill Phase III Expansion project began for COMANCO in July, and since then our teams have completed construction of the access road, sub-base limerock installation, water retention pond construction, earth cutting & f…
COMANCO is on-site in Tarpon Springs with Envirocon as part of the closure of an old Stauffer Chemical elemental phosphorus plant. Stauffer, in cooperation with the FL DEP, has been working on the remediation, clean-up and closure of this plant wh…
Keller Canyon Landfill in Pittsburg, California is an expansion to an existing cell. Today was the beginning of the liner installation. With a total of 56,000 sf. installed.
COMANCO’s powerhouse R&D team has released the ‘production’ model of our exclusive 5-station tensiometer. We are very proud to be the first ever geosynthetics installer to use such a machine. This leap in technology means that one full test – mean…
The COMANCO crew “floated” up to meet the challenge during the installation of a heat exchanger at a Bartow FL job site. Since the pond is concave (shallow at the shore, deeper in the center) it was necessary to get the 42” HDPE pipe riser assembl…
COMANCO onsite with Mid-State Machine & Fabrication installing 42” HDPE floating suction head and pipe at a Bartow FL job site. Notice that foreman Justino Macedo, a recent Water Safety graduate, and his crew are all wearing their PFDs in accordan…
The Alaska Crew has reached a major milestone in the construction of the Heap Leach Pad out at the Fort Knox Gold Mine in Fairbanks, AK. COMANCO started the installation back in the summer of 2008 and worked until the weather shut the job down for…
Congratulations and excellent job by the crew on another Safe, Quality, On Time Project Completion. The crew battled high winds and excessive rain events throughout the construction of this 12 acre multiple layer landfill cell just outside of Salt…
……Another Happy Customer, and another Safe, Quality, and On Time installation by the COMANCO Team. Dodging rattle snakes and all, the team successfully performed the installation of a 40 mil HDPE White Geomembrane along with 3,000 lf of extrusion …