Go to...
  • HOME
  • ABOUT US
    • EMPLOYEE RESOURCES
  • NEWS
    • COMANCO BLOG
    • NEWSLETTERS
  • X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW
COMANCO
  • MARKETS
  • SERVICES
  • ADVANTAGES
  • CAREERS
  • CONTACT

Liner - Page 11

COMANCO > COMANCO BLOG > Liner
  • 01-WC-SLD-LF-Cell-4-Blog-400x300.jpg
  • 02-WC-SLD-LF-Cell-4-Blog-400x300.jpg
  • 03-WC-SLD-LF-Cell-4-Blog-400x300.jpg
  • 04-WC-SLD-LF-Cell-4-Blog-400x300.jpg

COMANCO Moves Ahead with New Landfill Cell in Southwest FL

Project Update: Southwest, FL Landfill Cell  Superintendent Jorge Gomez and his COMANCO crew recently completed the liner installation for a 13.7-acre landfill cell in Southwest FL. The crew has installed 60 mil HDPE textured liner, 200 & 300 mil geocomposite, …

Read more
July 11, 2022
News·Projects
by COMANCO
  • Newmont-4-Blog-frame-copy-400x300.jpg
  • Newmont-3-FEATURE-Blog-frame-copy-400x300.jpg
  • Newmont-2-Blog-frame-copy-400x300.jpg
  • Newmont-1-Blog-frame-copy-400x300.jpg

COMANCO Completes Liner Installation Project in Nevada

A COMANCO crew led by Supervisors Pablo Medina and Carlos Garcia installed a four-layer system in a pond application that also consisted of a leak collection and removal sump area. The system included 50,000sf of 24oz geotextile, 25,000sf of 60mil …

Read more
October 26, 2021
Mining·News·Ponds and Reservoirs·Projects·Tailings and Storage
by COMANCO

COMANCO Completes Liner Replacement Project

COMANCO recently completed a project for Pasco County Utilities. The scope of work included the demolition and replacement of the liner for the Wesley Chapel north reject pond. These ponds are lined to prevent measurable seepage. SAFETY ★ QUALITY ★ …

Read more
June 15, 2021
News·Projects
by COMANCO
  • COMANCO-Stormwater-Management-1-400x300.jpg
  • COMANCO-Stormwater-Management-4-400x300.jpg
  • COMANCO-Stormwater-Management-2-400x300.jpg
  • COMANCO-Stormwater-Management-3-400x300.jpg

COMANCO Installs Geosynthetic Liner for Stormwater Management

Multiple COMANCO crews, led by supervisor Jonathan Mitchell, have been excavating, lining, and covering a stormwater holding pond, transfer ditch, and two collection ditches as part of a stormwater improvements project at a power plant in Central Florida. These ponds …

Read more
April 29, 2021
News·Projects
by COMANCO
  • COMANCO-Rain-Shed-Install-blog-1-400x235.jpg
  • COMANCO-Rain-Shed-Install-blog-4-400x235.jpg
  • COMANCO-Rain-Shed-Install-blog-5-400x235.jpg
  • COMANCO-Rain-Shed-Install-blog-2-400x235.jpg
  • COMANCO-Rain-Shed-Install-blog-3-400x235.jpg

COMANCO Crew Completes Rainshed Liner Installation

Congrats to our Rainshed Reduction Project Liner Install Crew for closing out a total of 25 acres of liner install. This allows for our earthwork crews to complete the remaining soil haul cover needed for the 36” sump area and …

Read more
August 11, 2020
News·Projects
by COMANCO
  • COMANCO-Carson-Hill-Mine-blog-1-400x235.jpg
  • COMANCO-Carson-Hill-Mine-blog-2-400x235.jpg

COMANCO Completes Liner Cover Replacement at a Gold Mine in CA

A COMANCO crew led by Superintendent Carlos Garcia completed a Liner Cover Replacement project located at a Gold Mine in Central California. This is part one of a two-part project. Part one of this project consisted of installing a 2-layer …

Read more
June 30, 2020
News·Projects
by COMANCO
  • COMANCO-Chemical-Plant-Liner-Installation-blog-1-400x235.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-2-400x235.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-3-400x235.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-4-400x235.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-5-400x235.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-6-400x235.jpg

Central Florida Chemical Plant Liner Installation

Our COMANCO crews are close to the finish line on the remaining three acres of subgrade needed to complete the 60mil liner installation portion of a Central Florida Reactivation project. The weather conditions have not been ideal, but our frontline …

Read more
June 19, 2020
News·Projects
by COMANCO
  • 1-3-400x235.jpg
  • 4-1-400x235.jpg
  • 3-1-400x235.jpg
  • 2-1-400x235.jpg

COMANCO Completes Liner Installation on Central Florida Landfill Cell Closure Project

Recently a COMANCO crew Led by Superintendents Chase Yarbrough and Jorge Barrantes completed a liner installation closure project on a 14 acre Central Florida Landfill Cell. The project consisted of installing a 2-layer geosynthetic system consisting of a 40mil HDPE …

Read more
May 4, 2020
News·Projects
by COMANCO
  • 2-400x235.jpg
  • 1-400x235.jpg
  • 3-400x235.jpg
  • 4-400x235.jpg
  • 5-400x235.jpg

COMANCO Crew Makes Headway on Rain Shed Closure

At our Central Florida Chemical Plant, COMANCO earthwork and liner crews are pushing to complete a closure in order to reduce rain shed. The earthwork crew activities consist of disc and amendment with dolomitic limestone of the existing gypsum slopes, …

Read more
May 1, 2020
News·Projects
by COMANCO
COMANCO Mosaic New Wales Facility (3)

COMANCO Making Progress at Chemical Plant in Central FL

Superintendents Jeremy Giles and Larry Graham lead the earthwork and liner crews to complete the 40-acres of cut/fill and subgrade and the installation of 40-acres of 60 mil liner, stabilization and gravel drains. For Phase I of the project, they …

Read more
January 15, 2020
News·Projects
by COMANCO
  • Previous
  • 1
  • …
  • 9
  • 10
  • 11
  • 12
  • 13
  • …
  • 15
  • Next

Recent Posts

  • Earl Lynch Earns Promotion
  • COMANCO Offers Daily Rate Repair Services
  • COMANCO Awarded Landfill Cell 25 by Palm Beach SWA
  • COMANCO Attends The Elko Mining Expo
  • COMANCO Celebrates the Career of Tomas Aguilar

Archives

  • HOME
  • ABOUT
  • MARKETS
  • SERVICES
  • X
© 2025 Comanco. All rights reserved.