Central Florida Chemical Plant Liner Installation

  • COMANCO-Chemical-Plant-Liner-Installation-blog-1.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-2.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-3.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-4.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-5.jpg
  • COMANCO-Chemical-Plant-Liner-Installation-blog-6.jpg

Our COMANCO crews are close to the finish line on the remaining three acres of subgrade needed to complete the 60mil liner installation portion of a Central Florida Reactivation project.

The weather conditions have not been ideal, but our frontline crews fervently continue to dewater and clean the existing installed liner.  This helps to prepare for the next phase of our project which is hauling the protective liner cover, followed by the installation of stabilization drains, seepshields and Fabriform. The project close out is scheduled for July 2020.