• 01-Ecosouth-Blog-400x300.png
  • 02-Ecosouth-Blog-400x300.png
  • 03-Ecosouth-Blog-400x300.png

COMANCO Demobilizes Completed Project

COMANCO Demobilizes Another Completed Containment Project COMANCO demobilizes another completed containment project in Central Florida. With the new partial cell fully lined, COMANCO has finished a new safe disposal site for future waste. Materials used by our crew include Geosynthetic …

Read more
by
  • 01-Trail-Ridge-Jacksonville-Completion-400x300.png
  • 02-Trail-Ridge-Jacksonville-Completion-400x300.png
  • 03-Trail-Ridge-Jacksonville-Completion-400x300.png
  • 04-Trail-Ridge-Jacksonville-Completion-400x300.png

COMANCO Completes Final Layer at Trail Ridge Landfill

COMANCO Completes Final Layer, Phase 6, at Trail Ridge Landfill in Jacksonville, Florida.  COMANCO completes the 6th and final layer of geosynthetics (Primary Geocomposite layer) and Leachate Collection System at the Trail Ridge Landfill in Jacksonville, Florida, a project that …

Read more
by
  • 01-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 02-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 04-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 03-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 05-HOF-Proj-Update-Jan-2023-Blog-400x300.png
  • 06-HOF-Proj-Update-Jan-2023-Blog-400x300.png

Headway Made on 5-Layer System

Headway Made On 5-Layer Geosynthetic System as COMANCO Prepares to Install Geomembrane Flap. COMANCO makes headway installing a 5-layer geosynthetic system in Central Florida. Once complete, the new Class I Landfill will be a safe repository for Class I Waste. …

Read more
by
  • 01-RIverview-BLog-400x300.png
  • 02-Riverview-Blog-400x300.png
  • 03-Riverview-Blog-400x300.png

COMANCO prepares for Dewatering

COMANCO Prepares for Dewatering Ditches After Installing Liner on the Slopes of Central Florida Work Site.  COMANCO prepares for dewatering ditches on a vast Central Florida project. At the end of 2022, the crew installed the last bit of liner …

Read more
by
  • 01-Trail-Ridge-Landfill-Blog-Fixed-400x300.png
  • 02-Trail-Ridge-Landfill-Blog-Fixed-400x300.png
  • 03-Trail-Ridge-Landfill-Blog-Fixed-400x300.png

Live From the Field: New Landfill Cell in North Florida

Superintendent Martin Calderon is “Live From the Field” checking in this morning with a soft Florida sunrise reflecting on the Trail Ridge Landfill site.  This week, the COMANCO crew will continue moving forward with GCL, geomembrane, and geocomposite deployment.  Keep …

Read more
by