COMANCO Works on Power Plant Repairs

COMANCO Works on Power Plant Repairs in Tampa COMANCO was recently contracted to complete repairs for a Power Plant in Tampa, Florida. We have made significant progress since starting the job at the end of 2023.  Initially, we installed composite …

Read more
by
  • Artboard-1-400x300.png
  • Artboard-2-400x300.png
  • Artboard-3-400x300.png
  • Artboard-4-400x300.png
  • Artboard-5-400x300.png

COMANCO Gets The Liner Rolling

COMANCO Gets the Liner Rolling at Newly Redesigned Sanitary Collection Cell After completing the Redesign Stage at a new sanitary collection cell in Central Florida, COMANCO is finally ready to get the liner rolling. Though the redesign initially stalled the …

Read more
by
  • 01-RIverview-BLog-400x300.png
  • 02-Riverview-Blog-400x300.png
  • 03-Riverview-Blog-400x300.png

COMANCO prepares for Dewatering

COMANCO Prepares for Dewatering Ditches After Installing Liner on the Slopes of Central Florida Work Site.  COMANCO prepares for dewatering ditches on a vast Central Florida project. At the end of 2022, the crew installed the last bit of liner …

Read more
by
  • 01-COMANCO-Live-From-The-Field-Freeport-Blog-400x300.png
  • 02-COMANCO-Live-From-The-Field-Freeport-Blog-400x300.png
  • 03-COMANCO-Live-From-The-Field-Freeport-Blog-400x300.png
  • 05-COMANCO-Live-From-The-Field-Freeport-Blog-400x300.png

Live From The Field In Freeport

Good Morning, LIVE from the field in Freeport, FL! Superintendent Bill Newman checks in live from the field in Freeport, Florida, with an on-site update. COMANCO crew members continue excavating over one thousand pounds of dirt and concrete. The entire expansion …

Read more
by

North Florida Update

COMANCO and Trader Construction remain hard at work on a project in North Florida. In the last month, over 150,000 cubic yards of material has been dewatered, excavated, hauled, and compacted to create a rim dike. Other recent progress includes …

Read more
by

Dredge Launches on Project in Southeast US

COMANCO and Trader Construction recently encountered an existing pond area that was extremely difficult to dewater. Because of this, the decision was made to use a dredge to remove the saturated material from the pond. Trader assisted the operation by …

Read more
by

COMANCO Making Progress in Southeast U.S.

Since last September, the team of COMANCO Environmental and Trader Construction has been hard at work on a project in the Southeast U.S. The beginning stages of the project consisted of mainly site preparation, with Trader clearing/grubbing and dewatering an …

Read more
by