• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

COMANCO Completes Liner Installation on Gyp Stack

by

A COMANCO crew led by Foreman Gerardo Ruiz has completed the installation of a composite and liner system on a 15-acre gyp stack slope closure project at a chemical plant in Florida. The crew utilized custom roll length liner in order eliminate seams on slopes. This installation also utilized newer equipment such as the liner winch, lighter spreader bar, and sand bag funnels.

SAFETY  QUALITY  SERVICE

Gyp Stack Liner6 Gyp Stack Liner5 Gyp Stack Liner4 Gyp Stack Liner3 Gyp Stack Liner2