COMANCO Receives Z-3 Hurricane Blower

Superintendent Martin Calderon and his crew of 15 continued their installation of 220 acres of 80 mil HDPE white textured, conductive liner at a plant in south Louisiana.  The crew has been fighting rain on a consistent basis and really …

Read more
by

COMANCO Finishes Lateral Sump in Southern Idaho

The three-man COMANCO Environmental crew recently completed an installation for a lateral sump in Southern Idaho.  To date, the crew produced impressive results installing over 5,300 SF of double-sided textured 60-mil HDPE geomembrane and performed 616 LF of extrusion welding …

Read more
by

COMANCO QUALITY

From the desk of QA/QC Manager Tammy Klish: Conducting a Liner Integrity Survey on a liner that has many wrinkles has always been a challenge. It involves passing the electrode over the same area from different angles, several times, in order …

Read more
by

North Florida Update

COMANCO and Trader Construction remain hard at work on a project in North Florida. The dredge work in the first area of the pond was completed, and the cell is currently being dewatered. Although the dredge was able to remove …

Read more
by