A COMANCO crew led by Superintendent Gerardo Ruiz has continued to install 30 mil PVC liner in a retention pond in Central Florida. The project includes 4 ponds designed to hold stormwater. The crew has had to deal with heavy afternoon rains that have created obstacles for the project; however they have maintained the level of Safety and Quality that COMANCO strives to accomplish on all of our projects. With the completion of the 2nd pond, COMANCO will be halfway through the installation process, and we look forward to completing the final ponds with the same dedication to Safety, Quality, and Service that was applied on the first two.
SAFETY ★ QUALITY ★ SERVICE