COMANCO Begins Methane Gas Management System at Corporate Park in South Florida

  • COMANCO-Methane-Gas-Management-blog-1.jpg
  • COMANCO-Methane-Gas-Management-blog-2.jpg
  • COMANCO-Methane-Gas-Management-blog-3.jpg

COMANCO has begun installing and constructing a passive gas management system on the next building at a premier industrial park in South Florida.

The COMANCO team, led by Superintendent Jorge Barrantes, is currently installing 140,000sqft of a 60mil HDPE geomembrane vapor barrier system. The design is complete with gas venting strips beneath the liner that ties into a 6” Sch80 PVC header system that directs any potential vapors beneath the building out and away from the property.

Up next, the crew will be heading next door to start work on the second building of identical size and similar design.

Do you have a project in need of a gas management system? Partner with COMANCO to bring safety and efficiency to your job site! Learn more here.

SAFETY ★ QUALITY ★ SERVICE