COMANCO Crew’s Complete Second Layer of Geosynthetic Installation

by

This week, a COMANCO crew, led by Liner Foreman Carlos Garcia, completed the installation of Geosynthetic Clay Liner (GCL) and Secondary Geomembrane for a new 15-acre cell expansion project in Central Florida.

The liner crew to date has installed over 1.3 million SF of geosynthetics, exposed the existing Cell 2’s liner system for the tie-in process, and finished excavating the entire anchor trench.

Next, the liner crew will begin the installation of the Secondary Geocomposite layer and gravel for the Leak Detection System (LDS) Trench.

Continue to check the blog for updates as our COMANCO earthwork and liner crews simultaneously make headway!