A COMANCO crew led by Superintendent Carlos Garcia completed a Liner Cover Replacement project located at a Gold Mine in Central California.
This is part one of a two-part project. Part one of this project consisted of installing a 2-layer geosynthetic system consisting of a 12oz non-woven geotextile followed by 40mil double sided textured HDPE geomembrane. Overall, the crew installed over 80,000sf of non-woven geotextile and over 403,000sf of 40mil double-sided textured HDPE. Stay tuned to see how part two of this project finishes. This is another successful completion for COMANCO.
SAFETY ★ QUALITY ★ SERVICE