COMANCO Environmental has completed construction of a 5-acre coal ash landfill expansion in Palatka, FL at the Seminole Generating Station.  The site had to be stripped, cleared & grubbed, balanced out with cut & fill operations and fill had to be imported in to reach a liner design sub-grade elevation.  A 5 layer geosynthetic system – GCL, primary & secondary 60-mil HDPE geomembrane, primary & secondary double-sided geocomposite – was then installed.  2’ of clean protective cover soil was then  placed over the liner system followed by sod.  In addition, 2 leachate collection HDPE pipes (wrapped in gravel & geotextile) were installed over the liner and tied into the adjacent, active cell.

Superintendent, Bill Newman, and Foreman, Jorge Gomez, did a great job keeping the crews on task and finished on schedule while maintaining COMANCO’s valued safety culture.