COMANCO has begun a stormwater improvement project in the Southeast near Mobile, Alabama. The scope of work includes relocating power lines, building a storm water forebay, relocating & improving access roads, an enhancement to two stormwater ponds, replacing non-functional drainage culverts with new rip-rap outlet basins, restoring storm water ditches to create proper drainage and installing Turf-Reinforcement Mat (TRM) and hydroseeding these areas.
The eight-man crew is doing a great job coordinating heavy machinery while continually maintaining a high level of safety awareness in the confined commercial work zone. The crew is led by Supervisor, Matt Carroll, and Foreman, Pedro Beltran.
SAFETY ★ QUALITY ★ SERVICE