COMANCO is making progress on the Boyette Road Reservoir project in Florida. The team has continued installation of the HDPE liner, composite drainage net, and textile on the slopes; and has now started the installation of the Flexible Tie-In at the toe. The tie-in includes a non-woven textile, geosynthetic clay liner, and HDPE liner per the plans. The final product in the tie-in is a 1 foot thick placement of flowable fill.
The team is working hard to adjust to the weather schedule, keeping safety their first priority. Please enjoy some progress photos from this week!