• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

Pond Renovation Project Kicks Off

by

COMANCO has recently begun a lime sludge pond renovation project at a Central Florida chemical facility. Supervisor Matt Carroll and Foreman Justino Macedo are leading the 12-man crew as they begin to make headway. A few keys tasks off the get-go include conditioning, loading, and hauling of 25,000CY of unsuitable material to an onsite disposal area. COMANCO will then prepare subgrade with quality fill material and install 15 acres of 80mil HDPE liner and place a 2-foot protective cover layer. Continue to check in as this project ramps up.

 SAFETY ★ QUALITY ★ SERVICE