• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

Pipe Installation Begins on Sand Filter Project

by

COMANCO has begun installation of the filter piping drainage system for a Central Florida chemical company.  36″ HDPE corrugated pipe will go in first followed by 12″ HDPE corrugated pipe. Single sided composite will be wrapped around the 12″ pipe to help collect water and channel it to the drainage system. Superintendent Tommy Terry and Foreman Gerardo Ruiz are safely leading the crew during this project. COMANCO is utilizing several pieces of heavy equipment to help with the installation, therefore, constant communication between the crew members is a must to help ensure a safe work environment. Please enjoy several pictures as the installation process kicks off.

SAFETY  QUALITY  SERVICE