COMANCO recently replaced a section of 60 mil HDPE Smooth geomembrane liner at Water Conserv II in Winter Garden, FL. The liner was installed where a damaged concrete driveway was removed. The project also consisted of tie-in welding liner to the embed channel in a new concrete driveway that was installed, located at a different section of the pond.
The project lasted one week, and was led by Superintendent Larry Graham. Great job to the whole crew for completing this project with zero safety incidents! Enjoy some photos of the project.