This project highlights COMANCO’s diversity and flexibility in 2 ways.
One, we are installing a liner composition of geomembrane and 2’ of clay liner. The clay liner must meet strict Georgia EPD standards. Second, this 22 acres cell was originally designed to be installed at one time. However, the owner needed the additional space. COMANCO has worked with the engineers and the owner to open a 13 acre portion first to allow room for their waste expansion.
The lighter color on this picture represents the subgrade and the darker color is the clay.