As impending weather threatens to delay two new cell construction in North Florida, Superintendent, Martin Calderon, guides his crew in the right direction. After laying HDPE liner on a larger 10-acre cell with only Geocomposite left to install, Martin switched to the additional 1-acre cell on the same site to get it covered immediately after the earthwork is completed. The flexibility and dependability that Martin has shown makes him a great company asset. The team understands the need to protect this site and work performed thus far but does not fall short on proper safe work practices in the abbreviated time frame. Keep up the good work guys!