COMANCO is in the progress of replacing two holding pond liners at a Waste Water Treatment Plant in Williston, FL. The entire scope of work consists of dewatering & removing silt from existing ponds, removing existing liner system, re-grading the ponds’ sub-grade, installing a new 60-mil smooth HDPE geomembrane liner, installing two new concrete ramps with HDPE embed for liner tie-in, pipe boots & batten bar at concrete structures. In order to keep the Treatment Plant active, each pond is having to be completed separately. So far one pond is complete, with the 2nd in progress.
The COMANCO team, led by Supervisor Kenny Frazier, is doing a great job maintaining a safe work environment while coordinating between the two ponds.