The COMANCO team has been working this week on installing liner containment pads for a turn around at a chemical plant in Bartow, FL. The containment pads will be used for storing and washing plant equipment until the turn around work is complete. The pads are made up of 20’ x 60’ pads of HDPE liner and geocomposite ballasted at the edges by concrete bags. By the end of today, the crew will have installed five of these in two days.
The crew also worked on lining four dumpsters with HDPE liner in order to contain hazardous material and this portion of work was completed yesterday. The crew is being led by Project Superintendent Juan Gomez, Project Manager Dragan Milosavljevic and Sr. Project Engineer Nick Bridges.