A COMANCO crew, led by Supervisor Ronald Wyatt is progressing on a Secondary Containment on a tank farm in Southern Louisiana. The crew has successfully installed 45,000 square feet of 80 mil textured Secondary Conductive liner, 1,700 LF of Batten Bar, and 2,500 LF of polylock embed to contain water waste and acid spills within the tank farm. Batten Bar and polylock systems have been installed against the tanks and concrete structures to hold the liner in place enforcing containment. The crew has been faced with the constant challenge of rising groundwater throughout areas of the project. The team continues to persevere and work safely while providing QUALITY and SERVICE, the COMANCO way.