COMANCO has recently begun liner installation on two holdings ponds for dredge material in Tampa, FL. The 8-man crew led by Superintendent Max Macedo will be installing nearly 260,000SF of GSE 60mil smooth HDPE liner. Along with liner installation, the crew will be completing four pipe boot installations throughout the two ponds. COMANCO started the project with a safety meeting and site walk around. Continue to check in as the crew makes progress on the two ponds.
SAFETY ★ QUALITY ★ SERVICE