COMANCO Environmental recently began another project at a landfill near Dallas, Texas. The scope includes installing 70,000 SF of 60-mil textured liner and DS Geocomposite on the slopes, and 150,000 SF of 60-mil smooth liner and SS Geocomposite on the floor. The total duration is expected to be approximately 10 days, as Tony Sanchez and crew will finish up next week.