A COMANCO crew led by superintendent Gerardo Ruiz recently completed the installation of a PVC pond liner on a retention pond at a Central Florida hospital. The pond liner installation of over 18, 000 square feet of 30 mil PVC was completed in this, the last of two mobilizations. The COMANCO team also installed a pipe boot around a 36 inch reinforced concrete pipe, and batten bar around two concrete control structures in the pond. Through hard work, dedication to safety, and to quality, the COMANCO crew provided the service to help the medical center become better prepared to deal with future storm water events.
SAFETY ★ QUALITY ★ SERVICE