The 23-man COMANCO crew led by Supervisors Jorge Gomez and Leroy Smith finished deployment and installation of the final landfill closure in Pontiac, IL. The landfill closure project consists of a two layer system with an install quantity of over 1,220,012 SF of 40-mil LLDPE double-sided textured liner and 220-mil double-sided geocomposite layer. The installation also included 92 pipe-boot penetrations in various sizes throughout the landfill closure. The crew did an outstanding job to maintain a safe and efficient manner of work, in spite of the constant high winds and rain delays they face on a weekly basis.