COMANCO completed the lining of a fuel containment system for a mine South East of Carlin, Nevada. COMANCO crew installed 80 Mil HDPE Double Sided Textured Geomembrane and installed a couple 48” Pipe Boots around the bollards.
COMANCO completed the project safely and on time.