COMANCO Environmental recently wrapped a 4-acre pond liner project in Jacksonville, FL. This was the 2nd mobilization required to complete the job. Over 90,000 SF of a 30-mil HDPE Geomembrane liner was installed and one 60″ pipe boot was constructed for the new stormwater run-off pond. Supervisor, Gerardo Ruiz, and his 8-man crew were able to complete this 2nd mob incident-free. Great job team!