COMANCO finished the Calamus Fish Hatchery Project in Nebraska.  The walk through took place today with the owner and the engineer and was accepted with no additional work required. This project scheduled for 131 work days, was completed 37 days early and under budget. The Team was led by Basilio Bonilla and Luis Londono with Chase Yarbrough playing a key role with the need for real time surveying. The entire team did a great job.

 

Calamus_fish_hatchery_053Calamus_fish_hatchery_054Calamus_fish_hatchery_088Calamus_fish_hatchery_037