A COMANCO crew led by Superintendent Jorge Barrantes recently began work on a gas mitigation system for a brownfield reuse project in South Florida. The crew began by installing a trenchless venting system that will combine with over 9,000 LF of a header pipe that is designed to divert potentially harmful gasses away from the future building. Soon, the crew will begin to install a 60 mil HDPE vapor barrier over the venting system, with the same quality and service we provide our customers on all of our projects.
SAFETY ★ QUALITY ★ SERVICE