A 6-man COMANCO crew led by Superintendent Pablo Medina and Foreman Marcelino Cruz recently started the double-sided Geocomposite underdrain installation at a landfill in Arlington, TX. By the end of this project, the crew will have installed nearly 374,000 SF of 200mil double-sided underdrain Geocomposite; 403,000 SF of 60mil HDPE textured Geomembrane; and 383,000 SF of 300mil single-sided Geocomposite. We look forward to seeing the progression of this project!
SAFETY ★ QUALITY ★ SERVICE