A COMANCO crew led by Superintendent Bill Newman has begun the installation of a 60 mil rPP liner in a tank containment area at a chemical plant in Central Florida. The crew up to this point has been installing batten bar ready to connect the liner to the existing concrete. In tight areas where liner is required on jobs like this one, reinforced polypropylene is a great liner option as it is more flexible than HDPE liner. Reinforced polypropylene is just one of many liner materials that COMANCO crews are experienced in installing.
SAFETY ★ QUALITY ★ SERVICE