• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

COMANCO Begins Liner Deployment at Coal Ash Landfill

Led by Superintendent Nathan Wilfong, COMANCO has begun deploying the liner system for the coal ash landfill project in Palatka, FL. The crew will be installing over 1 million square feet of 60-mil Double-sided Textured HDPE Geomembrane as well as 750,000 square feet of Double-sided Geocomposite. The crew has done a great job preparing the subgrade for this cap and installing stormwater management structures along the way.

Keep up the safe work and continue to represent COMANCO’s SAFETY  QUALITY  SERVICE