Led by Superintendent Nathan Wilfong, COMANCO has begun deploying the liner system for the coal ash landfill project in Palatka, FL. The crew will be installing over 1 million square feet of 60-mil Double-sided Textured HDPE Geomembrane as well as 750,000 square feet of Double-sided Geocomposite. The crew has done a great job preparing the subgrade for this cap and installing stormwater management structures along the way.
Keep up the safe work and continue to represent COMANCO’s SAFETY ★ QUALITY ★ SERVICE