Design-Build Project in Central Florida

COMANCO has been working on a design-build project for the Orange County Eastern Water Reclamation Facility. The project consists of designing the complete liner system for a 30 acre Reject Water Holding Pond, including all detailed connections to new and existing structures, …

Read more
by

Recreation Pond Liner Installation

COMANCO recently installed 30 mil HDPE textured geomembrane for a 5-acre storage pond at a recreation facility near central Florida. The project team was led by foreman Maximino Macedo and was completed on schedule and with zero incidents! Another great …

Read more
by

Rain Cap Liner Maintenance and Stormwater Improvements

COMANCO recently completed a stormwater collection improvements and rain cap maintenance project in Florida. The duration of the project lasted 3 months and finished with zero safety incidents. Work completed consisted of inspecting and repairing damage to the existing liner over two landfill capped …

Read more
by

Fabriform Installation Completed

COMANCO recently completed the installation of 4,000sf of Filter-Point Fabriform on a project near central Florida. The fabriform was installed in conjunction with a larger contract in performing regular maintenance on the HDPE geomembrane. The crew performed the installation on …

Read more
by

Road Construction Progress

COMANCO has been working steadily on the new entrance road at a landfill in central Florida. The project started back in June and is getting closer to completion as each month passes. Recently, the soil surcharge that COMANCO was contracted to place has …

Read more
by

Ten Workplace Safety Tips…

From the desk of COMANCO’s Safety and HR Coordinator, Cindy Reed: Ten Workplace Safety Tips… Always be responsible for the safety of yourself and others. Always remember all accidents are preventable. Always follow company rules, regulations and procedures. Always access …

Read more
by