COMANCO Begins EPDM Installation in Atlanta

Last week, COMANCO began an EPDM liner installation project in Atlanta, Georgia. The project consists of installing 45-mil EPDM liner for two different StormTech drain systems, totaling roughly 60,000 SF of material. This project requires multiple mobilizations to complete. The …

Read more
by

COMANCO Finishes Sumps in Northern Nevada

The 8-man COMANCO Environmental crew recently completed an installation for six sumps in Northern Nevada.  The crew produced impressive results installing over 27,315 of non-woven geotextile; 27,315 SF of double-sided textured 60-mil HDPE geomembrane; and performed 1500 LF of extrusion …

Read more
by

COMANCO Finishes Landfill Closure In Illinois

The 12-man COMANCO crew led by Superintendents Jorge Gomez currently finished the deployment and installation for a final closure in the Chicago area. Throughout the landfill closure project approximately 2,683,870 SF of both 40mil LLDPE Double-sided Textured Geomembrane liner and …

Read more
by

COMANCO BEGINS RPP TANK CONTAINMENT PROJECT

COMANCO is underway installing Reinforced Polypropylene tank containment liner for a Central Florida chemical company. Superintendent Bill Newman is leading the charge as the crew will be installing 18,500SF of 60MIL RPP liner and 450LF of stainless steel batten bar. …

Read more
by