COMANCO Project Completed in North Dakota

The tank expansion project in Trenton, North Dakota has wrapped up work.  The project consisted of deploying over 118,000 SF of 60-mil smooth high density polyethylene (HDPE) geomembrane and over 500 LF of batten bar.  The crew worked through icy terrain …

Read more
Uncategorized

Tank Expansion in North Dakota

COMANCO has started work on a tank expansion in Trenton, North Dakota. The crew will deploy around 120,000 SF of 60-mil smooth HDPE geomembrane and about 500 linear feet of batten bar. The weather is frigid, but the crew started …

Read more
Uncategorized

Mining Project in Northern Nevada

The heap leach pad expansion project near Lovelock, Nevada has deployed over 1,500,000 square feet of 80-mil double sided HDPE geomembrane and reinforced geosynthetic clay liner (GCL). The 28 man crew led by superintendent Martin Calderon has encountered strong winds, …

Read more

Project Near Kansas City, MO Starts

COMANCO has started laying liner at an ash holding basin near Kansas City, Missouri. The crew is deploying 60-mil HDPE liner from one end of the basins to the other terminating in an anchor trench. The crew led by Superintendent …

Read more
Uncategorized

Los Angeles Landfill Construction

A COMANCO landfill project in Los Angeles, California consists of seven layers on the slope: two 16 ounce geotextile layers, a 80-mil single-sided textured HDPE layer, two geosynthetic clay liner (GCL) layers, a 60-mil double-sided textured HDPE layer, and a …

Read more
Uncategorized

Coffin Butte Is Finishing Up Work

The landfill project in Corvallis Oregon is nearing completion. The crew headed by Superintendent Tony Sanchez is presently placing High-Strength Geotextile on the benches of the slopes. The crew has done a great job working safely with no incidents on …

Read more
Uncategorized