COMANCO is currently working on a pond renovation project at a Central Florida chemical facility. Superintendent Matt Carroll and crew are currently excavating and hauling away 30,000CY of sludge material along with hauling 25,000CY of clean gypsum back in for liner subgrade prep. Foreman Justino Macedo has another crew exposing and cleaning 3,500LF of existing liner for future tie-in. COMANCO is utilizing its GPS Trimble system to ensure proper elevations are kept throughout the project. Continue to check back in for future updates.
SAFETY ★ QUALITY ★ SERVICE