COMANCO is currently in the process of installing 20 stormwater inlets in Polk County consisting of 18″ SDR 11 pipe grouted into a precast inlet structure, which transitions into a 24″ SDR 11 HDPE outlet pipe. The structures are a part of the cell expansion project and are designed to handle future storm water runoff from the cell.