COMANCO Begins Work on a Gas Mitigation Project in South Florida

A COMANCO crew led by Superintendent Jorge Barrantes recently began work on a gas mitigation system for a brownfield reuse project in South Florida.  The crew began by installing a trenchless venting system that will combine with over 9,000 LF of a header pipe that is designed to divert potentially harmful gasses away from the future building.  Soon, the crew will begin to install a  60 mil HDPE vapor barrier over the venting system, with the same quality and service we provide our customers on all of our projects.

SAFETY ★ QUALITY ★ SERVICE

Leave a Reply

×

Newsletter Signup

Your Name (required)

Your Email (required)

Input this code: captcha