• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

Methane Gas Mitigation System Installation in Miami | COMANCO

by
  • COMANCO-Blog-5.jpg
  • COMANCO-Blog-1-1.jpg
  • COMANCO-Blog-2-1.jpg
  • COMANCO-Blog-3-1.jpg
  • COMANCO-Blog-4-1.jpg
  • COMANCO-Blog-5-1.jpg
  • COMANCO-Blog-6.jpg

Methane Gas Mitigation System Supports Brownfield Redevelopment in Miami

Redeveloping former landfill properties requires specialized environmental construction solutions to safely manage subsurface gases. COMANCO recently completed a methane gas mitigation system installation beneath a future warehouse development in Miami, Florida, helping transform a former brownfield site into safe and productive commercial property.

This methane gas mitigation system was designed to safely vent methane gas away from the building footprint while supporting long-term environmental compliance and redevelopment goals.

Brownfield Redevelopment and Methane Gas Mitigation System Design

The methane gas mitigation system was engineered by SCS Engineers and installed beneath the warehouse structure to safely redirect methane gas generated from former landfill materials. This passive venting system helps prevent methane accumulation beneath the slab and creates a safer environment for future occupants and operations.

COMANCO continues to lead the environmental construction industry by supporting brownfield redevelopment projects with advanced geosynthetic and gas mitigation solutions.

Methane Gas Mitigation System Materials and Installation

The methane gas mitigation system installation included several specialized components designed to work together for long-term performance and reliability.

HDPE Liner and GeoVent Installation

Key materials installed during the project included:

  • 227,322 square feet of 60 mil smooth HDPE liner supplied by SKAPS
  • GeoVent gas venting material supplied by CETCO
  • Over 1,000 linear feet of 6-inch header pipe
  • Approximately 460 feet of 4-inch outlet piping
  • Nearly 100 feet of 6-inch vent riser piping
  • Schedule 80 PVC piping supplied by Harrington Industrial Plastics

The complete methane gas mitigation system safely vents methane gas away from the future warehouse structure while supporting environmental protection and regulatory compliance.

Leadership, Training, and Quality Control

The project was managed by Superintendent Tommy Terry with field leadership provided by Leadman Martin Calderon. Project Manager Gustavo Cardona coordinated specialized training focused on proper cutting, preparation, and solvent welding procedures for Schedule 80 PVC piping.

The training and preparation helped the crew achieve successful pressure testing on the first attempt, reinforcing COMANCO’s commitment to quality workmanship and first-time accuracy.

Supporting Long-Term Brownfield Redevelopment

COMANCO has supported brownfield redevelopment efforts across South Florida for more than a decade by installing methane gas mitigation systems beneath warehouse and commercial developments. These systems help transform previously unusable landfill property into safe, productive commercial space.

Projects like this demonstrate COMANCO’s expertise in:

  • Brownfield redevelopment
  • Methane gas mitigation systems
  • Geosynthetic installation
  • Environmental construction
  • Industrial site redevelopment

Learn more about COMANCO’s environmental construction services:
https://comanco.com/services/

Learn more about COMANCO’s brownfield redevelopment solutions:
https://comanco.com/advantages/

SAFETY ★ QUALITY ★ SERVICE


COMANCO is an environmental, commercial, and civil construction company specializing in constructing containment facilities.

For more than 35 years, COMANCO has been a trusted leader in environmental containment and geosynthetic installation, including advanced Membrane Gas Mitigation Systems (MGMS) for brownfield redevelopment projects. Our experienced team works alongside engineers and developers to install high-performance liner and gas mitigation systems. Our processes help to safely transform previously unusable sites into productive commercial and industrial spaces. Learn more about COMANCO’s Brownfield and MGMS solutions here.

4301 Sterling Commerce Dr, Plant City, FL 33566
(813) 988-8829 | comanco.com

LinkedIn | Facebook | Instagram | X | YouTube

Secret Link