• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

New River Landfill Closure Progress by COMANCO

by
  • COMANCO-New-River-Solid-Waste-Association-Landfill-blog.jpg
  • COMANCO-New-River-Solid-Waste-Association-Landfill-blog-4.jpg
  • COMANCO-New-River-Solid-Waste-Association-Landfill-blog-3.jpg
  • COMANCO-New-River-Solid-Waste-Association-Landfill-blog-2.jpg

New River Landfill Project Continues to Advance

The New River Landfill closure project continues to move forward as COMANCO Superintendent Forrest Detzel and his team make strong progress on-site. This project represents a significant milestone, as it will be the first permitted final closure of its kind in the State of Florida.

With a focus on precision and performance, the New River Landfill closure involves advanced geosynthetic systems designed to ensure long-term environmental protection and structural integrity.

Key Construction Milestones Achieved

Significant progress has already been made across multiple components of the New River Landfill project. The team has successfully completed large portions of critical infrastructure, including:

  • 1,690 LF of 1,994 LF of toe drain installed
  • 1,570 LF of 2,525 LF of anchor trench excavated and backfilled
  • 7,937 LF of 11,458 LF of ballast trench excavated and backfilled
  • Over 624,000 SF of exposed geomembrane cover installed
  • 7,662 LF of 11,458 LF of double wedge weld completed at ballast trenches

These milestones demonstrate the team’s efficiency and commitment to delivering high-quality results.

Advanced Liner Systems and Environmental Protection

The New River Landfill closure incorporates 15 acres of exposed geomembrane, along with ballast trenches and a toe drain collection system. These systems are designed to manage water flow, reduce environmental impact, and ensure long-term containment performance.

By utilizing proven geosynthetic materials and installation techniques, COMANCO continues to set the standard for landfill closure projects across Florida.

Learn more about COMANCO’s services:
https://comanco.com/services/

For landfill and environmental guidelines, visit:
https://www.epa.gov/landfills

Looking Ahead

As work continues, the team remains focused on maintaining safety, quality, and efficiency throughout every phase of the project. The progress at New River Landfill reflects the expertise and dedication of the entire crew.

Keep up the great work, COMANCO team!


SAFETY ★ QUALITY ★ SERVICE


COMANCO is an environmental, commercial, and civil construction company.

Contact COMANCO to discuss how our team can support your next project.

📍 4301 Sterling Commerce Dr, Plant City, FL 33566
📞 (813) 988-8829
🌐 www.comanco.com

LinkedIn Facebook Instagram X YouTube