COMANCO is in the later stages of a plant closure project near Mulberry, FL. This project started at the very end of 2013 and is coming to close by the end of 2014. The goal of the project has been to level the 85 acre site and grade it to promote drainage with little maintenance required once the project is complete.
Currently the team is working on fill and grading in a few areas, sodding the detention pond, installing Fabriform into a ditch and installing four (4) new culvert pipes through the middle berm of the pond.