COMANCO has begun a storm water remediation project in the Midwest near St. Louis, MO. The scope of work includes 350 cubic yards of excavation and re-grading to existing, non-functional drainage canal, removal and replacement of an existing rip rap outlet basin around culvert outlets, installation of 250 square yards of sod over newly graded storm water runoff ditch and installation of sprinkler system components. The five man crew is doing a great job coordinating heavy machinery while continually maintaining a high level of safety awareness in the confined commercial work zone. The crew is led by Superintendent Jeremiah Stockwell, Foreman Tommy Terry, and Project Engineer Greg Pignataro. The job is scheduled to be completed mid November 2014.