COMANCO is in the process of producing 3 new corporate videos for our website and YouTube channel. The camera crew spent the first day at a Central Florida landfill filming liner deployment and the installation of the leachate collection and leak detections systems.
From there, we traveled over to the Florida Polytechnic University to film the 7 ponds which were constructed by COMANCO with a 60 mil HDPE Smooth Geomembrane liner installed and connected to the concrete walkways with HDPE embed channel. This project started the summer of 2013 for COMANCO, and finished in May of 2014.
The second day, the camera crew spent the day filming at the COMANCO corporate office in Plant City, FL. Everyone had a great time and was eager to help make this vision become a reality. The links to the videos will be provided once they are done with filming and completed.