COMANCO Completes Project at Alligator Farm

by

COMANCO Environmental recently completed a liner project at an alligator farm in Florida. Included within the scope of this project was the installation of 60-mil smooth HDPE liner in a 20′ x 20′ area, as well as up the 4′ walls, for a total of about 720 square feet. The liner was then battened to the block walls with pressure treated 2 x 4’s. Also included within this project’s scope was installation of one 4″ pipe boot. Superintendent Nathan Wilfong ensured that this project was completed safely and efficiently.