COMANCO is finishing up the installation of a geomembrane vapor barrier beneath the foundation of a new apartment building in Orlando, FL. The crew led by Arnulfo Martinez installed a 40mil HDPE geomembrane over the footprint of the future building which will act as an impermeable barrier, and prevent unwanted gas from migrating into the building. The project was quite challenging, as it also required the installation of 250+ pipe boots around all of the penetrations throughout the building. The crew worked hard to ensure the high level of quality COMANCO guarantees with its work. Despite the high level of detail, the crew worked efficiently and successfully completed the project safely and on time.