• X
CORPORATE OFFICE 813-988-8829 | ELKO OFFICE 775-778-9577   APPLY NOW

COMANCO Begins Gyp Stack Drain Installation Project

IMG_03001

COMANCO has begun work on a slope drain installation project on a gyp stack in Central Florida. The team has been working hard the last month to secure all material needed for this large undertaking, and the project will consist of the installation of approximately 50,000 LF of HDPE pipe. The past 2 weeks, the crew has been demolishing a concrete structure at the SW corner of the stack as well as doing some initial excavation, grading, and surveying.

IMG_03031

The management team consists of Superintendent Gary Mitchell, Project Manager Dragan Milosavljevic, Sr. Project Engineer Nick Bridges, and Project Engineer Craig Stevenson.